Nosewheel box assembly
[2 hours] Drilled the holes in the nosewheel box sidewalls for the nosewheel axle bearing and the retraction arm bearing. Assembled and clamped the entire assembly and then disassembled everything to glue entire box together.
Building a Coot-A and other adventures in aviation
[2 hours] Drilled the holes in the nosewheel box sidewalls for the nosewheel axle bearing and the retraction arm bearing. Assembled and clamped the entire assembly and then disassembled everything to glue entire box together.